South Texas Electric Cooperative Energy Project
Finley Engineering provided the transmission line rebuild services to rebuild a 69 kV insulated to 138 kV operated at 69 kV, approximately 12 miles. Existing wood pole line upgraded to concrete poles with steel davit arms. Conductor 795 MCM 26/7 ACSR_AW, with shield 0.646 “ OPGW.
Finley Engineering also provided the transmission line rebuild services to rebuild a 69 kV insulated to 138 kV operated at 69 kV, approximately 15 miles. Existing wood pole line upgraded to concrete poles with steel davit arms. Conductor 795 MCM 26/7, with shield 0.646 “ OPGW.